Jubilee Place is the combined revitalisation of the historic Jubilee Hotel and creation of a 14-level diagrid steel office building. It is located on a challenging site above the Clem7 tunnels and features an 8m cantilever of 11 levels over the adjacent heritage-listed Jubilee Hotel. A lightweight structural steel diagrid solution was designed to overcome these challenges by directing the weight of the building to its perimeter.
This PCA-A Grade development has been expressly designed with impeccable sustainability credentials, to enhance performance, maximise productivity, and inspire employees.
Designed to achieve:
- Gold WELL Core and Shell Certification
- 6 Star Green Star Design + As Built (v1.2)
- 4 Star NABERS Water Rating
- 5 Star NABERS Energy Base Building Rating